permi.eu
Kaag en Braassem · Installing an exit

Constructing an exit in Kaag en Braassem

Fee from € 266,20 €266.20 for connection to municipal road; €532.45 for connection to provincial road
Permit required Permit required
Processing time

Article 2.27 Spatial Planning Activity: exit/driveway; road connection according to article 2.12 General Local Bylaws

Source: Regulation on the Levying and Collection of Fees Kaag en Braassem 2026 · established 19 December 2025

What this is

Creating or widening an exit affects the public road and is therefore regulated in almost all places.

environmental permit or notification; per municipality in the APV or the environmental plan

Where the application goes

Whether this goes through the Environmental Desk varies by municipality: if the rule is in the environmental plan it does; if it is still in the APV then it goes through their own desk. Municipalities have until 1 January 2032 to move those rules. The municipality page shows how it is there.

Apply yourself. In the Netherlands an authorized representative may submit the application via the Environment Portal (DSO), so this can be outsourced. We are building that service; today we look it up for you and do not yet submit. This page shows what it costs and where it needs to go.

← All permits in Kaag en Braassem